Life of Mine.

From first core to final cover: how a copper mine is found, permitted, built, run and closed, and where its value is won or lost.

The numbers in brief

A mine is decided in a few years, paid for up front, and judged decades later. The value is won or lost long before the first tonne and long after the last.

  1. 16 yearsthe average from discovery to first production, across 232 mines brought into production since 1990.1
  2. 45%of the non-ferrous discoveries made from 1950 to 2013 had become mines by 2014.2
  3. 25%the average overrun of as-built capital against the bankable feasibility estimate, across 63 mining and smelting projects.3
  4. About 2 billion tonnesof ore and waste moved over a 19-year mine plan for a large High Andes copper project.4
  5. Halvedthe average ore grade at Chile’s copper concentrators, from 1.38% in 2000 to 0.69% in 2025.5
A production blast breaks a bench in a High Andes open pit 8 min
Illustrative film of a fictional mine, Cerro Estrato. Includes NASA imagery.Every figure on screen carries its source.
Practitioner's challenge

Nine details in this film don't hold up.

Only someone who has worked on a mine will catch them all. Eight Strata marks are hidden in the film too. Count both, then check your answers.

Cover of the answer key
Download the answer key
PDF, 20 pages, 3.5 MB. Free, no details needed.

Watch the film first. The key has every detail and every mark with its timecode and a still.

The 2-minute briefing

Where a mine's value is won or lost.

Ten slides, one sourced chart each: the lead time, the capital, the grade, the cash and the closure bill.

Title slide of the Life of Mine briefing
View the 2-minute briefing
Opens in your browser. Free, no details needed.

Every figure carries its source and date, as in the film.

Where the mine plan enters the decision

A valuation inherits the lead time, the overrun and the closure bill.

Each one is set years before it shows in the numbers. We test a mine plan against what comparable projects actually delivered before a board commits capital to it.

Principal to principal.

If the film touches an asset or a decision on your desk, write to us directly.

[email protected]
Sources for the numbers in brief
  1. S&P Global Market Intelligence (P. Manalo), “From Discovery to Delay: Mine Permitting Stretches Project Timelines”, 8 July 2026. Link
  2. R. Schodde, MinEx Consulting, “Key issues affecting the time delay between discovery and development: is it getting harder and longer?”, PDAC Mineral Economics session, Toronto, March 2014. Link
  3. J. Bertisen and G. A. Davis, “Bias and Error in Mine Project Capital Cost Estimation”, Society for Mining, Metallurgy & Exploration, 2007. Link
  4. Josemaria Resources Inc., Feasibility Study news release, 19 October 2020 (ore 1,012 Mt, waste 992 Mt, 19-year mine life; total is a ZMK calculation). Link
  5. C. Cifuentes González, Centro de Estudios del Cobre y la Minería (CESCO), Producción de cobre en Chile 2000-2026, 2026, Table 2, from the Cochilco statistical yearbook. Link

Links accessed 27 Nov 2026.